Client: National Iranian Oil Engineering and Construction Company (NIOEC)
Owner: Esfahan Oil Refining Company (EORC)
SCOPE OF WORK:
– Technology & Know-How
– Engineering Design & Procurement Engineering Services
– Equipment & Material Supply
– Construction Management
UNITS:
Diesel (Gasoil) Hydrotreating Units (DHDT)
Sulfur Recovery Unit (SRU)
Tail Gas Treatment Unit (TGTU)
RFCC Gasoline Hydrotreating Unit (Prime G+)
RFCC LPG Merox
H2 Production Unit
Client: Oil Design & Construction Company (ODCC)
Owner: National Iranian Oil Engineering and Construction Company (NIOEC) / Tehran Oil Refining Company (TDRC)
Crude Distillation Unit (CDU)
Vacuum Distillation Unit (VDU)
LPG Recovery Unit
Diesel (Gasoil) Hydrotreating Unit (DHDT)
Naphtha Hydrotreating Unit (NHT)
Vacuum Gas Oil Hydrotreating Unit (VGO / VHDS)
CCR Reformer Unit
Fluid Catalytic Cracking Unit (FCC)
Isomerization Unit
LPG Treating Unit
Sulfur Recovery & Solidification Units (SRU)
Propylene Recovery Unit (PRU)
Amine Treating Unit (ATU)
Sour Water Stripping Units (SWS)
H2 Production Unit
N2 Production Unit
Crude Distillation Unit (Revamp)
Vacuum Distillation Unit (New)
Visbreaker Unit (New)
Utilities
Offsite
LOCATION:
Abadan Refinery (Khuzestan Province)
PARTNER:
Sazeh (Iran)
CONTRACT AWARD DATE:
February 1991
STATUS:
in Operation
Bandar Abbas Refinery
(8th Refinery Project)
OWNER / CLIENT:
Client: Chiyoda Corporation (Japan) & Snamprogetti-ENI (Italy)
Owner: National Iranian Oil Company (NIOC)
SCOPE OF WORK:
– Engineering Design & Procurement Engineering Services
– Construction Management & Site Supervision
CAPACITY:
320,000 BPSD
UNITS:
Kerosene Hydrotreating Unit (KHT; 25,000 BPSD)
LPG Splitter Units (2*4,800 BPSD)
Total Off-Gas (610 TPD)
Amine Treating Units (ATU; Plus 2*4,800 BPSD LPG)